Current Attempt in Progress Building a kayak using the composite method is a very tabor intensive process. In the Fabrication Department, the kayaks go through several steps as employees carefully place layers of Kevlar in a mold and then use resinto fuse together the layers. The excess resin is removed with a vacuum process and the upper shell and lower shell are removed from the molds and assembled. The seat, hatch and other components are added in the Finishing Department At the beginning of April, Current Designs had 29 kayaks in process in the Fabrication Department. Rick Thrue, the production manager, estimated that about Box of the materials costs had been added to these boats, which were about SON complete with respect to the conversion costs. The cost of thin Inventory had been calculated to be 58.740 in materials and AO in conversion couts During April, 77 boats were started. At the end of the month, the 35 kayaks in the ending inventory had 20% of the materials and 40% of the conversion costs already added to them Areview of the accounting records for April showed that materials with a cont of $19.500 had been requisitioned by the Fabrication Department and that the conversion costs for the month were $38.900 Complete a production cont reporter Aeril 2020 for the Fabrication Department using the weighted average method CURRENT DESIGNS Fabrication Department Production Cost Report For the Month Ended April 30, 2020 Equivalent Units Physical Units Materials Convention Cost Total MacBook Air 19 10 2 3 $ 4 % 5 0 8 7 8 1 0 9 Q w E R T Y o P A S D F G H J L N V V C V B . N M command command option CURRENT DESIGNS Fabrication Department Production Cost Report For the Month Ended April 30, 2020 Equivalent Units Materials Conversion Costs Plyysical Units Quantities Volts to be accounted for Work in process. April Started into production Total units Units accounted for Transferred out Work in process, April 30 Total units Conversion Costs Miti Unit.com Total.com Event Uit out MacBook Air 5 76 1 8 7 3 B 9 W E R T * o P S D F G H J V V B B N M ommand command optiu Costs Materials Conversion Costs 5 $ $ $ Unit costs Total cost Equivalent units Unit costs Costs to be accounted for Work in process, April Started into production Total costs Cost Reconciliation Schedule Conscounted for Transferred out Work in procesori 30 Conversion cos Tots.com Attems of SA MacBook Air 30 3 4 % 5 AN 8 9 0 Q E 20 Y o P A S D F G H j V N X V B N M 98 command command Materials Conversion Costs Total $ $ $ $ ule $ Attempts: 0 of 2 used SA MacBook Air TO 5029 F $ 4 % 5 A 6 3 8 7 8 9 1 O E R T Y 0 D F G H j L V C V B N . command op