Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Custom Fabric Ventures is a small company that produces fabric - based wardrobe accessories ( such as , handbags, scarves, and headbands ) and home
Custom Fabric Ventures is a small company that produces fabricbased wardrobe accessories such as
handbags, scarves, and headbands and home accessories such as placemats, pillows, and window
treatments The company keeps a limited number of popular items in stock, but primarily produces
custom orders. Customers are able to choose from a wide selection of styles, sizes, and fabrics for each
type of product. Most of the companys customers are small boutiques, home dcor shops, and home
decorators who serve clientele with discerning tastes. As a result, customers expect highquality
products.
The sales staff of Custom Fabric Ventures has just received the following order:
Custom Fabric Ventures
Customer Order Form
Customer: Katies Boutique
Order Date:
Order Due Date:
Description: Model Number: Quantity Unit Sales Price Total
Black & White Handbag BW $ $
Due to its popularity, the Black and White Handbag BW is normally a stock item. However, the
handbag is currently out of stock. Rather than producing only enough units to fill Katies order,
management would like to produce a job Job that is large enough to fill Katies order and replenish
stock. The fabric used for this job can be stacked four layers deep for cutting, while still maintaining the
quality and precision of the cut. Therefore, the company is able to realize some economies of scale by
producing the handbags in multiples of Management would like to produce enough units in this job
to have a minimum of and a maximum of handbags left in stock after Katies order has been filled.
Your primary task is to determine the cost of producing Job so that you can calculate the gross
profit on the sale to Katies Boutique. As part of this process, you will be required to schedule
production, purchase any raw materials that arent currently in stock, requisition materials for the job,
and complete the job cost record. You will also be asked to consider relevant management and
accounting issues and record the transactions related to this job in the companys accounting records.
The following stepbystep requirements will guide you through the entire job costing process. The
documents you will encounter in this case are normally completed electronically rather than manually.
In addition, these documents often interface with each other electronically in order to transfer data in
realtime, eliminate tedious calculations, and prevent errors. However, the underlying process is the
same regardless of whether the company uses electronic or manual documents.
Req. : Before the year began, Custom Fabric Ventures estimated the following costs for the year:
Type of Cost Estimated total
cost for the year
Selling and Administrative salaries and expenses $
Direct Labor Estimated DL hours @ average wage rate of $ per hour
Indirect plant labor
Plant utilities
Purchases of direct materials
Lease and property taxes on the plant
Marketing expenses
Depreciation on production equipment Equipment originally costing $
three year ago is being depreciated over a year useful life using straightline
depreciation. No salvage value is expected.
Indirect materials to be used in the plant
First, fill in the missing costs. Then, calculate the companys predetermined manufacturing overhead
rate, assuming the company uses direct labor hours as its allocation base:
Req: To realize maximum efficiency and meet managements desired level of stock, how many Black
& White handbags should be produced in Job
Req. : The production engineers have given you the materials requirements for each Black & White
handbag. Assume that no efficiencies in materials can be achieved by producing more than one unit per
batch. Complete the Bill of Materials for Job # found below. Be sure to include the quantity being
produced in the Job as well as the total quantity needed for each direct material.
BILL OF MATERIALS
JOB
Model: BW
Quantity: units
Part
Number
Description Quantity Needed
per unit
Total Quantity
needed
BWFF Black and White Floral Fabric yard
BWCheck Black and White Checkered Fabric yard
BFringe Black Fringe Trim yard
BStrap Black shoulder strapping and yard
PlCan Plastic Canvas sheet
Int Interfacing: Level sturdiness rating yard
Req. : The production engineers have also given you the production labor requirements for each
individual bag produced, assuming one bag is produced at a time:
Cutting time: minutes per bag;
Sewing time: minutes per bag;
Ironing time: minutes per bag
Since each bag must be sewn and ironed individually, no sewing and ironing labor efficiencies can be
achieved by producing larger batch sizes. Recall, however, that fabric can be stacked for cutting
purposes, such that the material for four bags c
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started