Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Data 0.4 (exponential parameter) Results L= 0.3206442 =0.0527086 =TI 4 S= 1 (mean service rate) (#servers) W= 0.2991803 N= 3 (size of population) W

image text in transcribedimage text in transcribed

Data 0.4 (exponential parameter) Results L= 0.3206442 =0.0527086 =TI 4 S= 1 (mean service rate) (#servers) W= 0.2991803 N= 3 (size of population) W = 0.0491803 Three machines are the maximum that can be assigned to an operator while still achieving the required production rate. The average number of machines not running is L = 0.32, so 1 (0.32/3) = 89.7% of the machines are running on the average. The utilization of servers is (\/s) = 1.072/(1-4) = 0.268. The Dolomite Corporation is making plans for a new factory. One department has been allocated 12 semiautomatic machines. A small number (yet to be determined) of operators will be hired to provide the machines the needed occasional servicing (loading, unloading, adjusting, setup, and so on). A decision now needs to be made on how to organize the operators to do this. Alternative 1 is to assign each operator to her own machines. Alternative 2 is to pool the operators so that any idle operator can take the next machine needing servicing. Alternative 3 is to combine the operators into a single crew that will work together on any machine needing servicing. The running time (time between completing service and the machine's requiring service again) of each machine is expected to have an exponential distribution, with a mean of 150 minutes. The service time is assumed to have an exponential distribution, with a mean of 15 minutes (for Alternatives 1 and 2) or 15 minutes divided by the number of operators in the crew (for Alternative 3). For the department to achieve the required production rate, the machines must be running at least 89 percent of the time on average. (a) For Alternative 1, what is the maximum number of machines that can be assigned to an operator while still achieving the required production rate? What is the resulting utilization of each operator? (b) For

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Operations Management Creating Value Along the Supply Chain

Authors: Roberta S. Russell, Bernard W. Taylor

7th Edition

9781118139523, 0470525908, 1118139526, 978-0470525906

More Books

Students also viewed these General Management questions