demand A 80, demand B 90, raw mterials A = 2. raw materials B= 8. price product A= 55 . price product B= 65 prduct

demand A 80, demand B 90, raw mterials A = 2. raw materials B= 8. price product A= 55 . price product B= 65
prduct A: step 1 W (10 min), step 2 X (10 min), step 3 Y (15 min)
prduct B: step 1 X (20 min), step 2 W (14 min), step 3 Y (25 min)
image text in transcribed
CKC manufactures two different types of toys (A and B, sold in 1,000-count boxes) that are manufactured and assembled on three different workstations (W, X, and Y) using a small-batch process (see Figure). Batch setup times are negligible. The flowchart denotes the path each product follows through the manufacturing process, and each product's price, demand per week, and processing times per unit are indicated as well. Purchased parts and raw materials consumed during production are represented by Inverted triangles. CKC can make and sell up to the limit of its demand per week; no penalties are incurred for not being able to meet all the demand. Each workstation is staffed by a worker who is dedicated to work on that workstation alone and is paid $6 per hour. Total labor costs per week are fixed. Variable overhead costs are $3,500/week. The plant operates one 8-hour shifts per day, 5 days per week. The senior management at CKC is concerned with the existing capacity limitation, so they want to accept the mix of orders that maximizes the company's profits. Traditionally, CKC has utilized a method whereby decisions are made to produce as much of the product with the highest contribution margin as possible (up to the limit of its demand), followed by the next highest contribution margin product, and so on until no more capacity is available. Because capacity is limited, choosing the proper product mix is crucial. The newly hired production supervisor is an avid follower of the TOC philosophy and the bottleneck method for scheduling. He believes that profitability can indeed be approved if bottleneck resources are exploited to determine the product mix. a) Which of the three workstations, W, X, or Y, has the highest aggregate workload, Product A and thus serves as the bottleneck for CKC? Step 1 $2 Step 2 at workstation X (10 min) at workstation W (10 min) Finish with Step 3 at workstation Y (15 min) Product: A Price: $55/unit Demand: 80 units/wk Raw materials Product B Step 1 at workstation X Step 2 at workstation W (14 min) Finish with Step 3 at workstation Y (25 min) Product: B Price: $65/unit Demand: 90 units/wk (20 min) Raw materials $8 Purchased part b) What is the profit if the traditional contribution margin method is used for determining CKC's product mix? Product Answer has a higher contribution margin/unit The best product mix according to this traditional approach is then Answer units of Answer and Answer units of Answer c) What is the profit if the bottleneck method is used for selecting the product mix? When ordered from highest to lowest contribution margin/minute at the bottleneck, the manufacturing sequence of these products is Answer The best product mix according to this bottleneck based approach is then Answer units of Answer and Answer units of Answer $6 Purchased part

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Finance questions

Question

It is given that a=2i+3j+k,b=i+j5k Determine: (a) a . b ; (b) ab

Answered: 1 week ago