Demand for a chemical at a manufacturing plant is estimated to be 21 litres per week. The plant sources the chemical from a local distributer.
Demand for a chemical at a manufacturing plant is estimated to be 21 litres per week. The plant sources the chemical from a local distributer. The chemical costs $10/litre. The capital cost is 5% per