Design a post-project Audit Sheet with at least 20 items. The items should cover all sections of the project: Project Charter, Work Breakdown Structure, Schedule
Design a post-project Audit Sheet with at least 20 items. The items should cover all sections of the project: Project Charter, Work Breakdown Structure, Schedule Baseline, Cost Baseline, Change Control, and Risk Assessment. 5) Do a self-audit on the project and complete the audit sheet designed