Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Design the primary sedimentation tank, anaerobic and aerobic digestion units and final sedimentation tank of a 3-state system for a swine manure plant. The farm

Design the primary sedimentation tank, anaerobic and aerobic digestion units and final sedimentation tank of a 3-state system for a swine manure plant. The farm consists of 10,000 swine with average weight of 60kg, and the daily cleaning water is 4 times the amount of raw manure. The swine are raised on traditional flat floor pens, and the wastewater are collected in a ditch outside the pens. The final effluent BOD, COD, and SS should be lower than 80pm, 600pm, and 150ppm respectively.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Chemical Engineering questions

Question

Which are non projected Teaching aids in advance learning system?

Answered: 1 week ago