Question
Details: Work Breakdown Structure and Cost Estimation (Cost Apportioned/Rough Order Magnitude - ROM) - Website Design and Deployment The hierarchical box WBS format below is
Details:
Work Breakdown Structure and Cost Estimation (Cost Apportioned/Rough Order Magnitude - ROM) - Website Design and Deployment
The hierarchical box WBS format below is the beginning of a WBS coding scheme (2 levels) for a website design and deployment project. Your director has asked you to develop high-level costs for the website project. The IT Director will use the information to get funding for the project. For example, a similar project ten years ago cost $459,000. Another department completed a similar project three years ago and came in at $290,000.
Required Actions: Your assignment is as follows:
- Task 1 - Using historical information, estimate the total costs to complete the project.
- Task 2 - Using percentages (cost apportioned), estimate the percentage needed to complete the project for each WBS level two code (1.1, 1.2, 1.3, and 1.4). Each of these boxes will have a percentage. When the level two codes are totaled, the total percentage should be 100%. You are forecasting a percentage portion of the estimated budget each level two code will cost.
- Task 3 - Using the starting WBS information, complete the WBS by identifying the high-level deliverables to complete the project. Each WBS two-level code below (1.1, 1.2,1,3, and 1.4) should have 4 - 5 level three deliverables under each level two code. When updated, you will have a three-level WBS.
- Task 4 - For each level three deliverable you identified, estimate the costs to complete each.
- Work Breakdown Structure Chart with Coding Scheme
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started