Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Road Gripper Tire Co. manufactures automobile tires. Standard costs and actual costs for direct materials,
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Road Gripper Tire Co. manufactures automobile tires. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 4,160 tires were as follows: Standard Costs Actual Costs Direct materials 100,000 lbs. at $6.40 101,000 lbs. at $6.50 Direct labor 2,080 hrs. at $15.75 2,000 hrs. at $15.40 Factory overhead Rates per direct labor hr., based on 100% of normal capacity of 2,000 direct labor hrs.: Variable cost, $4.00 $8,200 variable cost Fixed cost, $6.00 $12,000 fixed cost Each tire requires 0.5 hour of direct labor. Required: a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Price variance Quantity variance Total direct materials cost variance b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Rate variance Time variance Total direct labor cost variance $ c. Determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as Variable factory overhead controllable variance Fixed factory overhead volume variance ol Total factory overhead cost variance $
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started