Question
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 74,000 units of product were as follows:
Standard Costs | Actual Costs | ||
Direct materials | 229,400 lbs. at $5.00 | 227,100 lbs. at $4.90 | |
Direct labor | 18,500 hrs. at $16.20 | 18,930 hrs. at $16.60 | |
Factory overhead | Rates per direct labor hr., | ||
based on 100% of normal | |||
capacity of 19,310 direct | |||
labor hrs.: | |||
Variable cost, $3.90 | $71,430 variable cost | ||
Fixed cost, $6.20 | $119,722 fixed cost |
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Material Price Variance | ||
Direct Materials Quantity Variance | ||
Total Direct Materials Cost Variance |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Labor Rate Variance | ||
Direct Labor Time Variance | ||
Total Direct Labor Cost Variance |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Variable factory overhead controllable variance | Favorable or Unfavorable | |
Fixed factory overhead volume variance | Favorable or Unfavorable | |
Total factory overhead cost variance |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started