Direct Materials, Direct Labor, and Reports budgeted and actual costs for variable and fixed factory overhead along with the related controllable and volume variances.Factory Overhead

  1. Direct Materials, Direct Labor, and Reports budgeted and actual costs for variable and fixed factory overhead along with the related controllable and volume variances.Factory Overhead Cost Variance Analysis

    Mackinaw Inc. processes a base chemical into plastic. A detailed estimate of what a product should cost.Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 6,800 units of product were as follows:

    Standard Costs Actual Costs
    Direct materials 8,800 lb. at $4.90 8,700 lb. at $4.70
    Direct labor 1,700 hrs. at $16.50 1,740 hrs. at $16.90
    Factory overhead Rates per direct labor hr.,
    based on 100% of normal
    capacity of 1,770 direct
    labor hrs.:
    Variable cost, $3.70 $6,230 variable cost
    Fixed cost, $5.80 $10,266 fixed cost

    Each unit requires 0.25 hour of direct labor.

    Required:

    a. Determine the direct materials Price variance is the difference between the actual and standard prices, multiplied by the actual quantity.price variance, direct materials The cost associated with the difference between the standard quantity and the actual quantity of direct materials used in producing a commodity.quantity variance, and total direct materials The difference between actual cost and the flexible budget at actual volumes.cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

    Direct materials price variance $
    • Favorable
    • Unfavorable
    Direct materials quantity variance
    • Favorable
    • Unfavorable
    Total direct materials cost variance $
    • Favorable
    • Unfavorable

    b. Determine the direct labor The cost associated with the difference between the standard rate and the actual rate paid for direct labor used in producing a commodity.rate variance, direct labor The cost associated with the difference between standard and actual hours of direct labor spent for producing a commodity.time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

    Direct labor rate variance $
    • Favorable
    • Unfavorable
    Direct labor time variance
    • Favorable
    • Unfavorable
    Total direct labor cost variance $
    • Favorable
    • Unfavorable

    c. Determine variable factory overhead The difference between the actual variable overhead costs and the budgeted variable overhead for actual production.controllable variance, the fixed factory overhead The difference between the budgeted fixed overhead at 100% of normal capacity and the standard fixed overhead for the actual production achieved during the period.volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

    Variable factory overhead controllable variance $
    • Favorable
    • Unfavorable
    Fixed factory overhead volume variance
    • Favorable
    • Unfavorable
    Total factory overhead cost variance $
    • Favorable
    • Unfavorable

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Government Auditing Standards

Authors: U.S. Government Accountability Office

1st Edition

B0C9S8NVST, 979-8851147746

More Books

Students also viewed these Accounting questions

Question

Define language, and recognize its properties.

Answered: 1 week ago

Question

1 . 1 . Let x Answered: 1 week ago

Answered: 1 week ago