Do you accept this project with the estimated required rate of return being 8.5%? You will use IRR as the measure. Time 0 1 2
Do you accept this project with the estimated required rate of return being 8.5%? You will use IRR as the measure. |
Time | 0 | 1 | 2 | 3 | 4 | |
Total CFs | -1,250 | 325 | 485 | 435 | 425 |