Question
Draw a cross/ sectional plot of the site measured by your team. Use landscape orientation (= stream width on longest axis of the page), standard
Draw a cross/ sectional plot of the site measured by your team. Use landscape orientation (= stream width on longest axis of the page), standard graph paper (or Excel generated graphs) . Use different scales on the vertical and horizontal axes. Give your graph a title that includes the stream name, street location, and date of measurement. Include as many of the following details as possible (9 marks).
a. bankfull channel width
b. active/ wetted channel width
c. bankfull depth (measured or estimated)
d. location of thalweg and hydraulic head at three points
e. classification riffle, pool, glide, from hydraulic head (see OSAP channel morphology page)
f. approximate size of the stream bed substrate
g. Discharge (Q) estimate, using 0.90 as the friction coefficient
h. L and R banks with estimated slope and soil type (sand, clay, rock)
i. list of bank features – is it vegetated ? artificially reinforced ? are high water marks visible ?
Step by Step Solution
3.24 Rating (159 Votes )
There are 3 Steps involved in it
Step: 1
CrossSectional Plot of Stream Site Stream Name Town Creek Street Location 123 Main Street Anytown US...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started