Answered step by step
Verified Expert Solution
Question
1 Approved Answer
DRILLING ENGINEERING Question 1: (10 marks) A 13 3/8 rock bit will be used to drill 23 % average formation porosity of a hole section
DRILLING ENGINEERING
Question 1: (10 marks)
A 13 3/8 rock bit will be used to drill 23 % average formation porosity of a hole section from 6,000 to 6,950 ft depth within 8 hours. The 88% efficiency solid control equipment installed and only 3.2 % of solid content is allowable in the mud system, calculate how much mud volume need to be added to maintain the solid content in the mud. If after reach the 6,950 ft depth, the drilling operation continue for another 7 hours with the same rate, what will be the impact to the mud system.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started