Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

During and after the commissioning and turn-over process, the design and construction team need to provide the owner with many important documents for the operation

During and after the commissioning and turn-over process, the design and construction team need to provide the owner with many important documents for the operation of the building. These include all of the following, EXCEPT: Group of answer choices Design calculations for building systems. A list of things that the contractor secretly left out of the building to save costs. Samples and inventories of spare parts and materials used in the construction, to facilitate repairs. Final construction drawings, typically called "As Built" drawings. These incorporate any minor changes made during construction. Building Information Modeling (BIM) data, if included in the contract. Warranty, test-and-balance, and inspection documents. Operations and maintenance manuals for installed equipment

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Principles of Auditing and Other Assurance Services

Authors: Ray Whittington, Kurt Pany

19th edition

978-0077804770, 78025613, 77804775, 978-0078025617

Students also viewed these General Management questions

Question

What does the coefficient of determination measure?

Answered: 1 week ago