Answered step by step
Verified Expert Solution
Question
1 Approved Answer
During and after the commissioning and turn-over process, the design and construction team need to provide the owner with many important documents for the operation
During and after the commissioning and turn-over process, the design and construction team need to provide the owner with many important documents for the operation of the building. These include all of the following, EXCEPT: Group of answer choices Design calculations for building systems. A list of things that the contractor secretly left out of the building to save costs. Samples and inventories of spare parts and materials used in the construction, to facilitate repairs. Final construction drawings, typically called "As Built" drawings. These incorporate any minor changes made during construction. Building Information Modeling (BIM) data, if included in the contract. Warranty, test-and-balance, and inspection documents. Operations and maintenance manuals for installed equipment
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started