e Incorporated with Arconcernent ut sure to be the BITI Pro 4.000 Toet A 400 Tural street Baher The directorate 13700 tree wachtw Com 31.0 MOLIVERY Hea Laborated Machine Ondes i wepe pered Overhead EL PSY 120.400 9,000 3.000 . YOU 450 012,400 3.600 31.100,00 9.000 1,300 4,100 metodo A under city becoming mound your intermediate aktion 2 decimal 1.000 $400D 2200 5420 MOC, Moto, anche products Product and A Decade wired to producer Pode LA 13.0 3.000 Products Product total de la The direct laborate 32700 DL The Greatest contra torchroductie that Coupe Prodotti 227.00 Prodott 301.00 The con i com melowing wtv.com, NIVERY pe Labore 126,00 .000 3.000 Machine 58,60 1,500 11. 3. .000 4.000 6,000 The low avertended to out we couture Mound your internetdation 19 2 sin placea) Rebecca. Incorporated, manufactures and sells two products Product El and Product AZ Data concerning the expected production of each product and the expected total direct labor-hours (DLHS Expected Dirt Labor Total Direct Production Hours ler Unit Labor-Ilours Product si 10.0 6.000 Produet A7 600 1.000 Total direct labor-hours The direct labor rate is $27.00 per DH The direct materials cost per unit for each product is given below Direet Material coat per Unit Product 1 $ 227.00 Product 17 $23.00 The company has an activity based costing system with the following activity cost pools, activity measures, and expected activity Activity Measure DER Activity Cost Tools Labor related Machine setups Order sine Estimated Overhead Cost 5 124,400 58,660 917.480 $ 1.100,540 Expected activity Product Product A? Total 6.000 3,000 9.000 700 600 1,300 3,800 3,000 6.000 setup MILE The total overhead applied to Product A7 under activity-based costing is closest to: (Round your intermediate calculations to 2 decimal places.)