Question
E10.21Determining standard material cost: manufacturer Tahmar Valley Chemical Company manufactures industrial chemicals. The company plans to introduce a new chemical solution and needs to develop
E10.21Determining standard material cost: manufacturer
Tahmar Valley Chemical Company manufactures industrial chemicals. The company plans to introduce a new chemical solution and needs to develop a standard product cost. The new chemical solution is made by combining a chemical compound (nyclyn) with a solution (salex), heating the mixture to boiling point, adding a second compound (protet), and bottling the resulting solution in 10litre containers. The initial mix, which is 11 litres in volume, consists of 12 kilograms of nyclyn and 9.6 litres of salex. A 1litre reduction in volume occurs during the boiling process. The solution is cooled slightly before 5 kilograms of protet are added. The protet evaporates, so it does not affect the total liquid volume. The purchase prices of the raw materials used in the manufacture of this new chemical solution are as follows:
Nyclyn $2.90 per kilogram
Salex $3.60 per litre
Protet $4.80 per kilogram
Nyclyn +Salex (boiling point) + Protet (evaporate)Bottling
12 kg + 10kg(11 10Li )5kg10Li
Required:
Determine the standard material cost of a 10 litre container of the new product.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started