Answered step by step
Verified Expert Solution
Question
1 Approved Answer
E4-12 Assigning Costs Using Traditional System, ABC System LO 4-1, 4-3, 4-4,4-5,4-6] Bunker makes two types of briefcase, fabric and leather. The company is currently
E4-12 Assigning Costs Using Traditional System, ABC System LO 4-1, 4-3, 4-4,4-5,4-6] Bunker makes two types of briefcase, fabric and leather. The company is currently using a traditional costing system with labor hours as the cost driver but is considering switching to an activity-based costing system. In preparation for the possible switch, Bunker has identified two activity cost pools: materials handling and setup. Pertinent data follow Fabric Case Number of labor hours Number of material moves Number of setups 18,000 700 40 Leather Case 13,000 1,050 160 Total estimated overhead costs are $254,000, of which $210,000 is assigned to the materials handling cost pool and $44,000 is assigned to the setup cost pool Required 1. Calculate the overhead assigned to the fabric case using the traditional costing system based on direct labor hours. (Do not round intermediate calculations and round your final answer to the nearest whole dollar amount.) Overhead Assigned 2. Calculate the overhead assigned to the fabric case using ABC. (Round activity rates or activity proportions, and intermediate calculations to four decimal places.) Overhead Assigned 3. Was the fabric case over- or undercosted by the traditional cost system compared to ABC? Fabric Case
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started