Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

E4-14 (Algo) Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3, 4-4, 4-5] Julio produces two types of calculator, standard and deluxe. The

image text in transcribedimage text in transcribed

E4-14 (Algo) Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3, 4-4, 4-5] Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow: Number of machine hours Number of material moves Number of setups Standard Model Deluxe Model 26,500 625 85 31,500 925 575 Total estimated overhead costs are $382,020, of which $186,000 is assigned to the material handling cost pool and $196,020 is assigned to the setup cost pool. Required: 1. Calculate the overhead assigned to each product using the traditional cost system. 2. Calculate the overhead assigned to each product using ABC. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Calculate the overhead assigned to each product using the traditional cost system. (Round the overhead rate to four decimal places and round your final answer to the nearest whole dollar amount.) Overhead Assigned Standard Model Deluxe Model E4-14 (Algo) Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3, 4-4, 4-5] Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow: Number of machine hours Number of material moves Number of setups Standard Model Deluxe Model 26,500 625 85 31,500 925 575 Total estimated overhead costs are $382,020, of which $186,000 is assigned to the material handling cost pool and $196,020 is assigned to the setup cost pool. Required: 1. Calculate the overhead assigned to each product using the traditional cost system. 2. Calculate the overhead assigned to each product using ABC. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Calculate the overhead assigned to each product using the traditional cost system. (Round the overhead rate to four decimal places and round your final answer to the nearest whole dollar amount.) Overhead Assigned Standard Model Deluxe Model

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

More Books

Students also viewed these Accounting questions

Question

7. Can the operation be made safer?

Answered: 1 week ago

Question

2. Can the fixture now in use be improved?

Answered: 1 week ago

Question

3. Can handling of materials for the machine be improved?

Answered: 1 week ago