Answered step by step
Verified Expert Solution
Question
1 Approved Answer
E4-2 (Static) Assigning Costs to Activity Cost Pools, Identifying a Cost Driver (LO 4-2, 4-3] Name of Budgeted Cost Plant insurance Testing raw materials Manufacturing
E4-2 (Static) Assigning Costs to Activity Cost Pools, Identifying a Cost Driver (LO 4-2, 4-3] Name of Budgeted Cost Plant insurance Testing raw materials Manufacturing equipment setup Quality inspections Property taxes Electricity, plant Electricity, manufacturing equipment Depreciation, plant Depreciation, manufacturing equipment Maintenance worker (manufacturing equipment) Indirect labor (manufacturing equipment setup) Design engineering Budgeted Cost $ 86,100 45,000 7,200 57,000 23,000 14,000 51,250 18,800 36,700 22.500 8,300 220,000 Required: 1. Assign each of the budgeted costs above to one of the following activity cost pools: Engineering Equipment setup Quality control Factory facilities Manufacturing equipment 2. Compute the total cost of each pool. 3. Indicate whether the activities in each pool are unit, batch, product, or facility level. 4. Identify the most likely driver for each cost pool from the following list: Number of inspections/tests Square feet Machine hours Engineering hours Number of setups Use the following table to organize your answer. The engineering cost pool is done as an example. Other pools may have more than one cost item included. Activity Cost Pool 1. Costs Included in Pool 3. Unit, Batch, Product, 2. Total Cost of Pool 4. Cost Driver or Facility 220,000 Product Engineering Hours Engineering Design engineering Equipment Setup Quality Control Factory Facilities Manufacturing Equipment
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started