Question
E8-16 Determining Budgeted Overhead The overhead application rate for a company is $12 per unit, made up of $7 per unit of fixed overhead and
E8-16 Determining Budgeted Overhead
The overhead application rate for a company is $12 per unit, made up of $7 per unit of fixed overhead and $5 per unit of variable over- head. Normal capacity is 10,000 units. In one month, there was a favorable flexible budget variance of $2,500. Actual overhead for the month was $110,000 and actual units produced were 15,125. Based on this information, determine the amount of the budgeted overhead for the actual level of production.
E8-17 Calculating Factory Overhead: Two Variances
Munoz Manufacturing Co. normally produces 12,000 units of product X each month. Each unit requires 2.5 hours of direct labor, and factory overhead is applied on a direct labor hour basis. Fixed costs and variable costs in factory overhead at the normal capacity are $3.00 and $2.00 per direct labor hour, respectively. Cost and production data for May follow: Production for the month 11,000 UNITS Direct labor hours used 22,500 HOURS Factory overhead incurred for: Variable costs $33,000 Fixed costs $60,500 a. Calculate the flexible-budget variance. b. Calculate the production-volume variance. c. Was the total factory overhead under- or overapplied? By what amount?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started