E9.5 (Algo) Calculating Oirect Materials and Oirect Laber Variances (LO 9-3, 9-4) beth atrest. E9.5 (Algo) Calculating Direct Materiais and Direct Labor Variances [LO 9-3, 9-4) tient giviph hequiret 1. Caifitate 5uct is Cuth, drect moteriess yanances for both shevpos and water for the montin of duy 2. Caictate 5ube \& Curh, drect labor varances for the month of July Cempiete this questibn by entering ruur anewers in the tabs beiers. Garcate Sude s cut Required 2 , nences for the monis of 2yy E9-5 (Algo) Calculating Direct Materials and Direct Labor Variances [L0 9-3, 9-4) 5uds $ Culs is a local pet grooring shop ewned by Collin Bark. Colin has prepered the folowing standard cost card for eictidog bath ghen Aegulred: 1. Caicctile Suas s cuts, drect materias visiances for beth shampoo and wate for the montith of July 2. Calculate Suts 8 Cuth, deeca labor varences for the monele of July Complete this quention by enterime rour answars in the tabe below. Calaiatn Sues a cuns, dued laber varianses for the monce of mer. E9-5 (Algo) Calculating Direct Materials and Direct Labor Variances [LO 9-3,9-4] Suds \& Cuts is a local pet grooming shop owned by Collin Bark, Collin has prepared the following standard cost card for each dog both glven: Duning the month of July, Collin's employees gave 310 baths. The actual results were 705 ounces of shampoo used (cost of 3232.65 ), 6,100 gallans of water used (cost of $427, and labor costs for 250 hours (cost of $2,600 ). Required: 1. Caleulate Suds \& Cuts, direct materials variances for both shampoo and water for the month of July, 2. Calculate Suds \& Cuts, direct labor variances for the month of July. Complete this question by entering your answers in the tabs below. Cak Required 1 its, direct matenas variances for both shampoo and water for the month of Julk selecting "F" for faverable, "u" for unfoworable, and "None for no effect (le, zero variance)