Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Each area is operated initially at 50 Hz at no load and the tie-line is unloaded when the load in each area is suddenly

 



Each area is operated initially at 50 Hz at no load and the tie-line is unloaded when the load in each area is suddenly increased simultaneously. Under this condition, the area control error (ACE) in each area is found to be ACE, ACE =-20 MW. Assume load frequency control (LFC) is not employed and neglect losses and dependence of load on frequency in both areas. Use base power of 100 MVA in your calculations. (i) Calculate the steady-state frequency error (in Hz) and change in tie-line flow (in MW). State the tie-line flow direction clearly. Hence, determine the load increase (in MW) in each area. (ii) Suppose the tie-line is tripped and the two areas are separated. Based on the load increase obtained in part (i), determine the steady-state frequency error (in Hz) in each area.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Elements Of Chemical Reaction Engineering

Authors: H. Fogler

6th Edition

013548622X, 978-0135486221

More Books

Students also viewed these Finance questions

Question

Find the eigenvalues of the matrix C1 C2. Cn A= C1 2 Cn

Answered: 1 week ago