Question
Eastern Auto Parts Company manufactures replacement parts for automobile repair. The company recently installed a flexible manufacturing system, which has significantly changed the production process.
Eastern Auto Parts Company manufactures replacement parts for automobile repair. The company recently installed a flexible manufacturing system, which has significantly changed the production process. The installation of the new FMS was not anticipated when the current years budget and cost structure were developed. The installation of the new equipment was hastened by several major breakdowns in the companys old production machinery. The new equipment was very expensive, but management expects it to cut the labor time required by a substantial amount. Management also expects the new equipment to allow a reduction in direct material waste. On the negative side, the FMS requires a more highly skilled labor force to operate it than the companys old equipment.
The Following cost variance report was prepared for the month of July, the first full month after the equipment was installed. EASTERN AUTO PARTS COMPANY Cost Variance Report for the Month of July Direct material: Standard cost ............................................................................................................................................. $602,450 Actual cost ................................................................................................................................................. 598,700 Direct-material price variance ................................................................................................................... 150 U Direct-material quantity variance .............................................................................................................. 3,900 F Direct labor: Standard cost ............................................................................................................................................. 393,000 Actual cost ................................................................................................................................................. 383,800 Direct-labor rate variance ......................................................................................................................... 4,800 U Direct-labor efficiency variance ................................................................................................................ 14,000 F Production overhead: Applied to work in process ....................................................................................................................... 400,000 Actual cost ................................................................................................................................................. 408,000 Variable-overhead spending variance ...................................................................................................... 8,000 U Variable-overhead efficiency variance ..................................................................................................... 10,000 F Fixed-overhead budget variance .............................................................................................................. 30,000 U Fixed-overhead volume variance .............................................................................................................. (20,000)* *The sign of the volume variance is negative; applied fixed overhead exceeded budgeted fixed overhead.
Required:
Comment on the possible interactions between the variances listed in the report. Which ones are likely to have been caused by the purchase of the new production equipment? The company budgets and applies production overhead on the basis of direct-labor hours. (You may find it helpful to review the discussion of variance interactions in Chapter 10.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started