eBook Bob Russo, cost accounting manager for Home Products, was asked to determine the costs of the activities performed within the company's acting Engineering Department. The department has the following activities creating of materials (BOM), studying manufacturing capabilproving manufacturing proc. training employees, and designing tools. The resource costs from the general ledger) and the times to perform one unit of activity red below Resource Costa Unit Time Driver $32,000 0.ch NOM Salari Equipment Supplier Activities Creating BOM Designing tools Improving pro No. of tools $4,000 24,000 0. Promovement Now of training Total 5500,000 2.1 Training player studying capalities 2.1 Study hours Tot machine and tabor hout (optical capacity) Machine hours 2,000 10,000 Engineering hours Total hour 20.000 The activity, designing tools, uses the number of tools designed as the activity driver. Using traditional approach, the cost of the tools to dete to be $179,000 with an expected activity output of 1,000 for the coming year Duning the test week of the year to jobs to 150 and 11) demand for 10 and 20 new tool, respectively Required: 1. Calculate the capacity cost rate for the Manufacturing Enginering Department Round your answer to the nearest cont per hour 2. Using the capacity contrate, determine the activity rates for each activity. Found your answers to the nearest cent Activity Rates Der BOM Creating BOM Pro Ne) Check My Won Save and Submitment for Grading All work saved DOC to be $179.000 with an ected activity outout of 1,000 for the coming year During the rit week of the year, woohoob 150 and ob 151) had a demand for 10 and 20 new tools, respective Required 1. Calculate the cost ote for the Manufacturing Engineering Department Hound your answer to the nearest cent per hour 2. Dund the city cottate determine the activity rates for each activity Round your answer to the nearest cont Activity Rates Der BOM per tools Creating BOM Designing tools Improving Training employees per process improvement per training session Studying capabilities Der study hou Calculate the cost of designing tools that would be assigned to achousing the TOABC-derived activity rate and then resting the traditional AB Job 150 Job 151 ALE 4. Now suppose that the for creating BOSS 4 for a standard product but that creating Room for a custom product adds an adortions. El the time mation for this added complexity. Found your answer to two decimal places. Place the amounts left to right, lowest to highest Calculate the activity rate for the activity of creating a BOM for custom products. Round your answer to the nearest cent pe Che Want Previous Nee) All work cave SEE Submitment for Grading