Question
Eclipse Motor Company manufactures two types of specialty electric motors, a commercial motor and a residential motor, through two production departments, Assembly and Testing. Presently,
Eclipse Motor Company manufactures two types of specialty electric motors, a commercial motor and a residential motor, through two production departments, Assembly and Testing. Presently, the company uses a single plantwide factory overhead rate for allocating factory overhead to the two products. However, management is considering using the multiple production department factory overhead rate method. The following factory overhead was budgeted for Eclipse:
Assembly Department | $280,000 | ||
Testing Department | 800,000 | ||
Total | $1,080,000 |
Direct machine hours were estimated as follows:
Assembly Department | 4,000 | hours | |
Testing Department | 5,000 | ||
Total | 9,000 | hours |
In addition, the direct machine hours (dmh) used to produce a unit of each product in each department were determined from engineering records, as follows:
Commercial | Residential | |||
Assembly Department | 2.0 | dmh | 3.0 | dmh |
Testing Department | 6.0 | 1.5 | ||
Total machine hours per unit | 8.0 | dmh | 4.5 | dmh |
a. Determine the per-unit factory overhead allocated to the commercial and residential motors under the single plantwide factory overhead rate method, using direct machine hours as the allocation base.
Commercial | |
Residential |
b. Determine the per-unit factory overhead allocated to the commercial and residential motors under the multiple production department factory overhead rate method, using direct machine hours as the allocation base for each department.
Commercial | |
Residential |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started