Answered step by step
Verified Expert Solution
Question
1 Approved Answer
EcoFabrics has budgeted overhead costs of $954,450. It has assigned overhead on a plantwide basis to its two products (wool and cotton) using direct labor
EcoFabrics has budgeted overhead costs of $954,450. It has assigned overhead on a plantwide basis to its two products (wool and cotton) using direct labor hours which are estimated to be 454,500 for the current year. The company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. These two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). Total estimated machine hours is 202,000, and total estimated number of setups is 1,515. Overhead allocated to the cutting cost pool is $363,600 and $590,850 is allocated to the design cost pool. Additional information related to product usage by these pools is as follows. Machine hours Number of setups Cutting Design tA $ Wool Calculate the overhead rate using activity based costing. (Round per machine hour to 2 decimal places, e.g. 12.25.) tA 101,000 Overhead rates for activity-based costing $ 1,010 Cotton 101,000 505 per machine hour per setup
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started