Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

economic questions: 37. Does HCPS require the new APs to be added into Cisco Prime and dropped on location maps? 38. On page 57, xvill,

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed

economic questions:

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed
37. Does HCPS require the new APs to be added into Cisco Prime and dropped on location maps? 38. On page 57, xvill, is it possible to dispose of cardboard waste at HCPS facilities? 39. On page 61, f, i: in item xvi on the same page above terminates in CAT 5E, then CAT6A standards cannot be met. Can this requirement be modified by HCPS?31. The issuance of this RFP was 12/11. On page 65, Section VI the anticipated schedule outlines a RFP issuance date of 12/4. Is it possible to slide the schedule of the receipt of this RFP for one week? 32. The anticipated schedule shows cabling to run from 5/30 - 7/1. Can cabling work be performed during working hours from 5/30 - 6/20? If not, what are the hours that can be worked during this timeframe? 33. Can you provide us a list of the type and anticipated quantities of network equipment that will be decommissioned by school and need to be returned to Trampton? 34. Does HCPS desire a 6 year warranty on all MinuteMan UPS'? 35. Does page 50, C, 1, b imply that staging should be done at Trampton or do we have the option to configure at Offeror's facility, and then deliver to school? 36. Does page 51, D; imply that the project manager is required to be on-site full time?25. Attachment H specifies 4 new runs at colonial trail ES, the drawing shows 20 net new access points. How many cable runs should be quoted? 26. Attachment H specifies 27 new cable runs are needed for Crestview ES, the drawings show a total of 26 APs in the design after one is removed from the current design along with cable moves. How many new cable runs are required? 27. For T1 at Davis elementary, are cable runs run underground through conduit, or aerial to trailer 2? 28. Are man lifts available at each site to reach locations with high ceilings like gyms, or do we need to account for them in our installation cost? 29. How are wawies ted from Trailer 1 to trailers 2 - 5 at Glen Allen ES?16. Would HCPS consider a one-week extension for the submission of our response, moving the due date to January 13, 2016 at 2:00 pm? 17. Do patch cables need to be from a specific manufacturer? 18. What length should the cat6A patch cables be for the connections from the structured cabling outlet to the access point? 19. What length should the cat6A patch cables be for the connections from the cat6A patch panel to the switch? 20. Will wall mounted access points be positioned vertically and mounted directly to walls or will they require an additional mounting bracket to achieve proper orientation? 21. For warranty purposes, is it correct to assume that existing patch panels receiving new cable runs are manufactured by Hubbell? 22. Do all proposeu access point locations require new cabling? 23. Will existing AP locations utilize the existing cabling? 24. Will moved Access point locations utilize existing cabling or require new cabling

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introductory Econometrics A Modern Approach

Authors: Jeffrey Wooldridge

7th Edition

1337558869, 978-1337558860

More Books

Students also viewed these Economics questions