electric bike Work breakdown structure (WBS) divides the project into recognisable tasks and activities at different levels - Level 1: Project 25-Sep-20 6 - Level

electric bike
Work breakdown structure (WBS) divides the project into recognisable tasks and activities at different levels
- Level 1: Project
25-Sep-20
6
- Level 2: - Level 3: - Level 4:
Major tasks in the project Subtasks in the major tasks
Activities to be completed (work packages)
image text in transcribed
Generate a Work Breakdown Structure (WBS) for your project, similar to the example shown below 1.0 Trailer Design and Production 1.1 1.3 Project Planning 1.2 Project Development Project Close 1.2.1 1.1.1 Define design requirements 1.1.2 Select bought in components Frame Design 1.2.2 Trailer Design 1.2.3 Assemble &Test 1.3.1 Set up production line 1.3.2 Build 1st off batch 1.2.1.1 1.2.1.2 1.2.2.1 Design Lab Test Compete frame frame trailer geometry geometry design 1.2.3.1 1.2.3.21 1.2.3.3 Field Assemble Lab Test trial prototype prototype prototype A WBS of Trailer Design and Production 25-Sep-20 7

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Finance questions

Question

Solve the following 1,4 3 2TT 5x- 1+ (15 x) dx 5X

Answered: 1 week ago