electric bike Work breakdown structure (WBS) divides the project into recognisable tasks and activities at different levels - Level 1: Project 25-Sep-20 6 - Level
electric bike Work breakdown structure (WBS) divides the project into recognisable tasks and activities at different levels - Level 1: Project 25-Sep-20 6 - Level 2: - Level 3: - Level 4: Major tasks in the project Subtasks in the major tasks Activities to be completed (work packages) Generate a Work Breakdown Structure (WBS) for your project, similar to the example shown below 1.0 Trailer Design and Production 1.1 1.3 Project Planning 1.2 Project Development Project Close 1.2.1 1.1.1 Define design requirements 1.1.2 Select bought in components Frame Design 1.2.2 Trailer Design 1.2.3 Assemble &Test 1.3.1 Set up production line 1.3.2 Build 1st off batch 1.2.1.1 1.2.1.2 1.2.2.1 Design Lab Test Compete frame frame trailer geometry geometry design 1.2.3.1 1.2.3.21 1.2.3.3 Field Assemble Lab Test trial prototype prototype prototype A WBS of Trailer Design and Production 25-Sep-20 7
electric bike
Work breakdown structure (WBS) divides the project into recognisable tasks and activities at different levels
- Level 1: Project
25-Sep-20
6
- Level 2: - Level 3: - Level 4:
Major tasks in the project Subtasks in the major tasks
Activities to be completed (work packages)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started