Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Eli Orchid has designed a new pharmaceutical product, Orchid Relief, which improves the night sleep. Before initiating mass production of the product, Eli Orchid has

Eli Orchid has designed a new pharmaceutical product, Orchid Relief, which improves the night sleep. Before initiating mass production of the product, Eli Orchid has been market-testing Orchid Relief in Orange County over the past 9 weeks.

Now that the daily demand for Orange County can be predicted with reasonable accuracy using the M3 model, the COO of the company decided to use it to optimize the production of the new drug.

The daily demand values and production process data are recorded in the Excel file provided.

The new pharmaceutical product that the company wishes to introduce, Orchid Relief, uses two new ingredients. At this stage, Eli Orchid can procure limited amounts of each ingredient. The company has 4520 pounds of ingredient 1 and 3610 pounds of ingredient 2 available for this week.

Eli Orchid can manufacture the new product using any of its three existing processes that have different capabilities. The production with each of the processes is done in batches (a batch typically represents one full run of a machine from when it starts a task until it finishes it). Each batch of production by each of the processes uses different amounts of ingredients 1 and 2, and results in different number of units of Orchid Relief produced (note the difference between a batch and units of Orchid Relief produced). The table below outlines the cost per batch, amounts of the two ingredients required, and the number of units of Orchid Relief yielded per batch.

Process 1 Process 2 Process 3
Cost of production per batch $14,000 $30,000 $11,000
Ingredient 1 required per batch (pounds) 180 120 540
Ingredient 2 required per batch (pounds) 62 410 120
Orchid Relief yielded per batch (units) 120 310 60

Eli Orchid needs to determine how many batches to produce with each process in the least costly way given the limited availability of the two ingredients. Also, the total production of Orchid Relief in units must be greater than or equal to the total forecasted demand (in units) for the following week.

The COO of the company asked the analyst[1]:

[1] Round numbers to four decimal points (e.g. 0.1234), unless explicitly requested otherwise.

1. To use the new M3 model (M3 model is from PP3) updated with week 9 data to predict the total demand (in units) for Week 10 (days 64-70).

M3
Mon.
Tue.
Wed.
Thu.
Fri.
Sat.
Sun.
TOTAL:

2. To state if this is a maximization or a minimization optimization problem?
3. To provide the mathematical formulation of the objective function assuming that X1, X2, and X3 are the decision variables representing the number of batches of each process to be used.
4. To provide the mathematical formulation of the model constraints.

Supply of ingr. 1
Supply of ingr. 2
Units produced
Non-negativity X1, X2, X3 >= 0
Integer X1, X2, X3 : Integer

5. To use the "Production" tab of the Excel file and complete the setup by:

  • entering the forecasted total demand in the pink cell
  • entering formulas in the five grey cells based on the mathematical formulation

Excel Formulas:

Cost of Production
Supply of Ingr. 1
Unit Cost

6. To set up Excel Solver (Assume Constraint Precision of 0.000001 and Integer Optimality (%) of 0) and provide the solution to the optimization problem.

Number of batches
Process 1
Process 2
Process 3

Cost of production (obj.)
Unit cost ($###.##)

7. To label each constraint in the solution as binding or not-binding.

Supply of ingr. 1
Supply of ingr. 2
Units produced

8. To consider a possible shortage of ingredients in the following week. What would the optimized production process look like if Eli Orchard could only procure 4300 pounds of Ingredient 1 and 2400 pounds of Ingredient 2?

Number of batches
Process 1
Process 2
Process 3

Cost of production (obj.)
Unit cost ($###.##)

9. To label each constraint in the new solution (for the shortage of ingredients) as binding or not-binding.

Supply of ingr. 1
Supply of ingr. 2
Units produced

10. To make recommendations about the production processes and pricing of Orchid Relief.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Calculus Single Variable

Authors: Deborah Hughes Hallett, Deborah Hughes Hallet, Andrew M Gleason, William G McCallum, Daniel E Flath, Patti Frazer Lock, David O Lomen, David Lovelock,

6th Edition

1118748611, 9781118748619

More Books

Students also viewed these Mathematics questions

Question

Use mesh analysis to find Vo in the circuit shown. A. 4 12V

Answered: 1 week ago

Question

2 dims array maxVal java

Answered: 1 week ago