Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Embassy Motorcycles (EM) manufactures two lightweight motorcycles designed for easy handling and safety. The EZ-Rider model has a new engine and a low profile that

image text in transcribed Embassy Motorcycles (EM) manufactures two lightweight motorcycles designed for easy handling and safety. The EZ-Rider model has a new engine and a low profile that make it easy to balance. The Sport model is slightly larger and uses a more traditional engine. Embassy produces the engines for both models at its Des Moines, Iowa plant. Each EZ-Rider engine requires 6 hours of manufacturing time, and each Sport engine requires 3 hours of manufacturing time. The Des Moines plant has 2,100 hours of engine manufacturing time available for the next production period. Embassy's motorcycle frame supplier can supply as many EZ-Rider frames as needed. However, the Sport frame is more complex and the supplier can only provide up to 260 Sport frames for the next production period. Final assembly and testing requires 2 hours for each EZ-Rider model and 2.5 hours for each Sport model. A maximum of 880 hours of assembly and testing time are available for the next production period. The company's accounting department projects a profit contribution of $2,400 for each EZ-Rider produced and $1,800 for each Sport produced. (a) Formulate a linear programming model that can be used to determine the number of units of each model that should be produced in order to maximize the total contribution to profit. (Let E represent the EZ-Rider model and let L represent the Sport model.) Maxs.t.2,400E+()L()E+()L2,100L2E+2.5LE,L0 Engine manufacturing time Sport maximum Assembly and testing time (b) Solve the problem graphically. What is the optimal solution? (E,L)=() (c) Which constraints are binding? (Select all that apply.) Engine manufacturing time Sport maximum Assembly and testing time

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project Management With CompTIA Project+

Authors: Joseph Phillips

4th Edition

9781259860300

More Books

Students also viewed these General Management questions

Question

2.3 Define human resource ethics.

Answered: 1 week ago

Question

9 How can training be evaluated?

Answered: 1 week ago