Engineering project Given the following $3,000,000 Architectural/Engineering (A/E) design and construction management project for a new high school building (containing 2 floors and approximately 260,000

Engineering project

Given the following $3,000,000 Architectural/Engineering (A/E) design and construction management project for a new high school building (containing 2 floors and approximately 260,000 square feet) create a WBS (in ALL 4 separate formats: Outline View, Hierarchical Structure, Tabular View, and Tree Structure View - the University provided template MUST be used) to at least Level 3 (include the project, deliverables, activities and work packages) for the project based on the areas provided:

  • The upcoming A/E design and construction managementproject has the following project management areas:
  • Schematic Design
  • Design Development
  • Construction Documentation
  • Bidding Phase Services
  • Construction Administration Phase
  • Project Closeout
  • Project Management

Work Breakdown Structure (WBS)

And

WBS Dictionary

Name of Student

Date Submitted:

Note for students: TheGREEN text is for your information only in completing this template. Remove theGREEN guidance before submission of this assignment deliverable. Replace with your own text relative to the chosen assignment case study. .

For this assignment Norwich students will complete the outline view, hierarchical view, tabular view, the tree view and a WBS dictionary to WBS level three. Ensure WBS ID numbers are included for each element in the WBS's.Ensure funding is appropriately allocated to each element in your WBSs adhering to the 100% rule.

REMOVE THIS RED TEXT ALSO BEFORE SUBMISSION

Introduction

The WBS is a view into the project which shows what work the project encompasses. It is a tool which helps to easily communicate the work and processes involved to execute the project. The Project Manager and project team use the WBS to develop the project schedule, resource requirements and costs. There are many ways you can present the WBS for your project; this template provides many of the most popular layouts from which you can choose.Depending on where in the Project Plan you're putting the WBS a different layout may be more suitable.For instance many Project Managers include a high level WBS within the project plan, then a detailed version as an appendix to the plan. You may find that you prefer one layout for a high level WBS and a different one for a detailed WBS.

The Work Breakdown Structure presented here represents all the work required, AND ONLY THE WORK REQUIRED, to complete this project.

Outline View

The outline view presents an easy to view and understand layout for the WBS. It is also a good layout to use when developing the WBS because you can easily make changes, especially since the Microsoft Word auto numbering feature updates the WBS Code automatically. The outline format is recommended for larger projects. Ensure budget is allocated adhering to the 100% rule.

  1. Name of Project ($XXX,XXX)

2.1.Title of Phase/ Sub-system / Major Deliverable ($XX,XXX)

2.1.1.Activity A ($XX,XXX)

  1. Activity B ($XX,XXX)

2.1.3. Activity C ($XX,XXX)

2.1.4. Deliverable: (name of deliverable)

2.1.5. Milestone:(name of milestone event)

  1. Title of Phase/ Sub-system / Major Deliverable ($XX,XXX)
    1. Activity A ($XX,XXX)
    2. Activity B ($XX,XXX)
    3. Activity C ($XX,XXX)
    4. Activity D ($XX,XXX)
    5. Activity E (SXX,XXX)
    6. Activity F ($XX,XXX)
    7. Deliverable: (name of deliverable
    8. Milestone: Name of Milestone

4..1 Title of Phase / Sub-system / Major Deliverable ($XXX,XXX)

  1. Activity A ($XX,XXX)
  2. Activity B ($XX,XXX)
  3. Activity C ($XX,XXX)
  4. Activity D ($XX,XXX)
  5. Activity E ($XX,XXX)
  6. Deliverable: (name of deliverable
  7. Milestone: (name of milestone event)
  8. Name of Phase / Sub-system / Major Deliverable ($XXX,XXX)
    1. Activity A ($XX,XXX)
    2. Activity B ($XX,XXX)
    3. Activity C ($XX,XXX)
    4. Activity D ($XX,XXX)
    5. Deliverable: (name of deliverable
    6. Milestone:(name of milestone event)
  9. Name of Phase / Sub-system / Major Deliverable ($XX,XXX)
    1. Activity A ($XX,XXX)
    2. Activity B ($XX,XXX)
    3. Activity C ($XX,XXX)
    4. Activity D ($XX,XXX)
    5. Deliverable: (name of deliverable
    6. Milestone:Name of milestone event

7.1. Name of Phase/ Sub-system / Major Deliverable ($XX,XXX)

  1. Activity A ($XX,XXX)
  2. Activity B ($XX,XXX)
  3. Activity C ($XX,XXX)
  4. Activity C ($XX,XXX)
  5. Deliverable: (name of deliverable)
  6. Milestone: (Name of milestone event)
  7. Project Management ($XX,XXX)
    1. Activity A ($XX,XXX)
    2. Activity B ($XX,XXX)
    3. Activity C ($XX,XXX)
    4. Activity D ($XX,XXX)
    5. Deliverable: name of deliverable

Hierarchical Structure

The hierarchal structure is similar to the outline view but without indentation. Although this format is more difficult to read, it may be useful where you have many levels and indenting each level would make the table too large to fit into a document.

LevelWBS CodeElement NameBudget Allocated
11Name of Project
22.1.Name of Phase/ Sub-system / Major Deliverable
32.1.1Activity A
32.1.2Activity B
32.1.3Activity C
23.1.Name of Phase/ Sub-system / Major Deliverable
33.1.1Activity A
33.1.2Activity B
33.1.3Activity C
33.1.4Activity D
33.1.5Activity E
33.1.6Activity F
24.1Name of Phase/ Sub-system / Major Deliverable
34.1.1.Activity A
34.1.2Activity B
34.1.3Activity C
34.1.4Activity D
34.1.5Activity E
25.1Name of Phase/ Sub-system / Major Deliverable
35.1.1.Activity A
35.1.2Activity B
35.1.3Activity C
35.1.4Activity D
26.1Name of Phase/ Sub-system / Major Deliverable
36.1.1.Activity A
36.1.2Activity B
36.1.3Activity C
36.1.4Activity D
27.1Name of Phase/ Sub-system / Major Deliverable
37.1.1.Activity A
37.1.2Activity B
37.1.3Activity C
28.1Project Management
38.1.1.Activity A
38.1.2Activity B
38.1.3Activity C
38.1.4Activity D

Tabular View

The Tabular View is a nicely organized table view of the WBS. It is a good option for organizations which prefer table formats.

Level 1Level 2Level 3Budget Allocation

1Name of Project

2.1 Name of Phase/ Sub-system / Major Deliverable

2.1.1 Activity A

2.1.2 Activity B

2.1.3 Activity C

2.1.1

2.1.2

2.1.3

3.1 Name of Phase/ Sub-system / Major Deliverable

3.1.1 Activity A

3.1.2 Activity B

3.1.3 Activity C

3.1.4 Activity D

3.1.5 Activity E

3.1.6 Activity F

3.1.1.

3.1.2

3.1.3

3.1.4

3.1.5

3.1.6

4.1 Name of Phase/ Sub-system / Major Deliverable

4.1.1 Activity A

4.1.2 Activity B

4.1.3 Activity C

4.1.4 Activity D

4.1.5 Activity E

4.1.1.

4.1.2

4.1.3

4.1.4

4.1.5

5.1. Name of Phase/ Sub-system / Major Deliverable

5.1.1 Activity A

5.1.2 Activity B

5.1.3 Activity C

5.1.4 Activity D

5.1.1

5.1.2

5.1.3

5.1.4

6.1 Name of Phase/ Sub-system / Major Deliverable

6.1.1 Activity A

6.1.2 Activity B

6.1.3 Activity C

6.1.4 Activity D

6.1.1

6.1.2

6.1.3.

6.1.4

7.1 Name of Phase/ Sub-system / Major Deliverable

7.1.1 Activity A

7.1.2 Activity B

7.1.3 Activity C

7.1.1.

7.1.2

7.1.3

8.1 Name of Phase/ Sub-system / Major Deliverable

8.1.1 Activity A

8.1.2 Activity B

8.1.3 Activity C

8.1.4 Activity D

8.1.1.

8.1.2

8.1.3

8.1.4

Tree Structure View

The Tree Structure View is the most popular format for the WBS. It presents an easy to understand view into the WBS; however, it is also tricky to create without an application specifically designed for creating this organizational chart structure. The Tree Structure below was created using only Microsoft Word and the SmartArt graphics option under the insert menu.

image text in transcribed
Name of Project 1.0 SXXX,XXX Phase/subsystem Phase/subsystem Phase/subsystem Phase/subsystem Phase/subsystem Phase/Subsystem Project Mgt 3.1 6.1 7.1 8.1 2.1 4.1 5.1 SXXX,XXX SXXX,XXX SXX,XXX $XX,XXX $XX,XXX SXX,XXX SXXX,XXX Activity A Activity A Activity A Activity A Activity A Activity A Activity A 6.1.1. 8.1.1 2.1.1 3.1.1 4.1.1 5.1.1 7.1.1 SXX,XXX SXX,XXX SXX,XXX SXX,XXX SXX,XXX SXX,XXX SXX,XXX Activity B Activity B Activity B Activity B Activity B Activity B Activity B 5.1.2 6.1.2 7.1.2. 8.1.2 2.1.2 3.1.2 4.1.2 SXX,XXX SXX,XXX SXX,XXX SXX,XXX SXX,XXX $XX,XXX SXX,XXX Activity C Activity C Activity C Activity C Activity C Activity C Activity C 4.1.3 5.1.3 6.1.3 7.1.3. 8.1.3. 2.1.3 3.1.3 SXX,XXX SXX,XXX $XX,XXX SXX.XXX SXX,XXX SXX,XXX SXX,XXX Activity D Activity D Activity D Activity D Activity D 4.1.4 5.1.4 6.1.4. 8.1.4. 3.1.4 SXX,XXX SXX,XXX SXX,XXX SXX,XXX SXX,XXX Activity E Activity E 3.1.5 4.1.5 SXX,XXX SXX,XXX Activity F 3.1.6 SXX,XXX

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Auditing Cases An Active Learning Approach

Authors: Mark S. Beasley, Frank A. Buckless, Steven M. Glover, Douglas F. Prawitt

2nd Edition

0130674842, 978-0130674845

Students also viewed these General Management questions

Question

Determine miller indices of plane X z 2/3 90% a/3

Answered: 1 week ago