erson Industries, a small, family-run manufacturer, has adopted an ABC system. The following manufacturing activities, indire ufacturing costs, and usage of cost drivers have been estimated for the year. Click the icon to view activities, total costs, and cost drivers.) mg May, Allan and Allison Dickerson machined and assembled Job 484. Allan worked a total of 11 hours on the job, while Allis ked 4 hours on the job. Allan is paid a $25 per hour wage rate, while Allison is paid $31 per hour because of her additional erience level. Direct materials requisitioned for Job 484 totaled $1,300. The following additional information was collected on Jc The job required 3 machine setups, 5 machine hours, and 2 quality control tests. Compute the Complete the Data Table st determine the breach activity. achine setups achining uality control Activity Machine setup.... Machining Quality control..... Estimated Total Manufacturing Estimated Total Overhead Costs Usage of Cost Driver 152,500 3,050 setups 767,250 4,950 machine hours 258,500 4,700 tests run pation rate 50 per setup per machine hour 55 per QC test Complete the folle Print Done ob Cost Record JOB 484 Direct material Direct labor . Manufacturing overhead Total job cost............. Dickerson Industries, a small, family-run manufacturer, has adopted an ABC system. The following manufacturing activities, indirect manufacturing costs, and usage of cost drivers have been estimated for the year Click the icon to view activities, total costs, and cost drivers.) During May, Allan and Allison Dickerson machined and assembled Job 484. Allan worked a total of 11 hours on the job, while Allison worked 4 hours on the job. Allan is paid a $25 per hour wage rate, while Allison is paid $31 per hour because of her additional experience level. Direct materials requisitioned for Job 484 totaled $1,300. The following additional information was collected on Job 484: The job required 3 machine setups, 5 machine hours, and 2 quality control tests. 1. Compute the activity cost allocation rates for the year. 2. Complete the job cost record for Job 484. First determine the formula to compute the allocation rate for the activity-based cost rate, then calculate the rate for each activity Total manufacturing overhead / Est. total use of cost driver - Activity cost allocation rate Machine setups 152500 3050 50 per setup Machining 767250 4950 155 per machine hour Quality control 258500 4700 55 per QC test 2. Complete the following job cost record for Job 484 Job Cost Record Manufacturing JOB 484 Costs Direct material. Direct labor Manufacturing overhead Totaljob cost