Question
Essay 1. The difference between design capacity and effective capacity 2. Assumptions from the Break Even analysis: 3. What can the operations manager do to
Essay
1. The difference between design capacity and effective capacity
2. Assumptions from the Break Even analysis:
3. What can the operations manager do to deal with bottleneck operations?
Problem 1
Markland Manufacturing intends to increase capacity by overcoming bottleneck operations by adding new equipment. Two vendors have submitted proposals. The fixed fee for proposal A is $ 50,000, and for proposal B, $ 70,000.
The variable cost for A is $ 12 and for B, $ 10. The income generated by each unit is $ 20.
a) What is the break-even point in the unit for proposal A?
b) What is the break-even point in the unit for proposal B?
Problem 2
3 work stations illustrated in the following figure have a product that must go through one of the two machines at station 1 (parallel) before proceeding to station 2.
"The attached image"
a) What is the system jam?
b) What is the bottleneck station of this work cell?
c) Throughput time?
d) If the company operates 10 hours per day, 5 days per week, what is the weekly capacity of this work cell?
Station 1 Machine A Capacty: 20 units/hr Station 2 Station 3 Station 1 Capacty. 5 units/hr Capacity: 12 unitshr Machine B Capacity: 20 units/hr
Step by Step Solution
3.44 Rating (167 Votes )
There are 3 Steps involved in it
Step: 1
Problem 2t...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started