estimate is that there is an aow grebobily that the explioratory nets would ndcate gosd potental and this that further. werk wousd be done, and a 20% probabity that the autieok would liok bad and the projed would be abantoned. cil in the fied at t=2. The beat eabimate now as that ohere is a 60 s probobitry that the resubs would be very good and a agsh probabdity that resuits mould be poor and the fied modld se abancined. af t=3, and a 501 prebebeity of finding less oil and then onity receiving a sto,000 infow: 1. 5507.27 2. $3336.15 E. $373.50 a. 9461.11 b. 3415.00 Drating Experta, Inc. thoutands of doliart. t=0.As400 Prastaity mudy wsuld be condocted at t=0. The rewits of this study mould determine if bie comoshy should cempence dneing oferations or make ns forther mvetbment and ahondon the prepect. t=1. If the feowbity atuily indicates geed potentid, the fom would spend sa. 000 at t=1 ts dnil exploratiry weds. The beat work would te dore, and a 20% protebely that the octisek woud look bat and the prejec wovld be absidered. of in the field at t2. The beat catimate new is trat there is a eow probabity thas the recils would be very keod and a 4as grotahity that retults would be poor and the frild would be abandoned.at t 3, and a sow probgbity of Ending less oll avd then enly receiving a $10,000infw. 1. 5507.22 3. $336.15 537.50 1. $461.11 1.$415.00 estimate is that there is an aow grebobily that the explioratory nets would ndcate gosd potental and this that further. werk wousd be done, and a 20% probabity that the autieok would liok bad and the projed would be abantoned. cil in the fied at t=2. The beat eabimate now as that ohere is a 60 s probobitry that the resubs would be very good and a agsh probabdity that resuits mould be poor and the fied modld se abancined. af t=3, and a 501 prebebeity of finding less oil and then onity receiving a sto,000 infow: 1. 5507.27 2. $3336.15 E. $373.50 a. 9461.11 b. 3415.00 Drating Experta, Inc. thoutands of doliart. t=0.As400 Prastaity mudy wsuld be condocted at t=0. The rewits of this study mould determine if bie comoshy should cempence dneing oferations or make ns forther mvetbment and ahondon the prepect. t=1. If the feowbity atuily indicates geed potentid, the fom would spend sa. 000 at t=1 ts dnil exploratiry weds. The beat work would te dore, and a 20% protebely that the octisek woud look bat and the prejec wovld be absidered. of in the field at t2. The beat catimate new is trat there is a eow probabity thas the recils would be very keod and a 4as grotahity that retults would be poor and the frild would be abandoned.at t 3, and a sow probgbity of Ending less oll avd then enly receiving a $10,000infw. 1. 5507.22 3. $336.15 537.50 1. $461.11 1.$415.00