Question
Estimate the total direct cost and cost per 1,000 bf of lumber for transporting 70,000 bf of lumber from the lumberyard to a jobsite, which
Estimate the total direct cost and cost per 1,000 bf of lumber for transporting 70,000 bf of lumber from the lumberyard to a jobsite, which is 18 miles from the yard. Each truck can haul 3,000 bf per load and can average 40 mi/hr loaded and 45 mi/hr empty. Assume $55.00/hr for a truck with a driver.
Two laborers will load lumber onto the trick at the yard and another 2 laborers will unload the truck and stack the lumber at the job. Each laborer can handle 1,200 bf/hr. Assume laborers cost $21.00/hr. Assume a 50-min effective hour and determine the cost per 1,000 bf of lumber based on using the economical number of trucks.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started