Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Estimated Data Manufacturing overhead costs Direct labor-hours Machine-hours Job Bravo Direct labor-hours Machine-hours Required: Assembly $ 1,920,000 80,000 Fabrication $ 2,240,000 32,000 48,000 160,000
Estimated Data Manufacturing overhead costs Direct labor-hours Machine-hours Job Bravo Direct labor-hours Machine-hours Required: Assembly $ 1,920,000 80,000 Fabrication $ 2,240,000 32,000 48,000 160,000 Assembly 17 Fabrication 9 Total 26 12 21 Total $ 4,160,000 128,000 192,000 1. If Wilmington used a plantwide predetermined overhead rate based on direct labor-hours, how much manufacturing overhead would be applied to Job Bravo? 2. If Wilmington uses departmental predetermined overhead rates with direct labor-hours as the allocation base in Assembly and machine-hours as the allocation base in Fabrication, how much manufacturing overhead would be applied to Job Bravo? (Round your intermediate calculations to 2 decimal places.) 1 Plantwide manufacturing overhead applied to Job Bravo 2 Manufacturing overhead applied from Assembly to Job Bravo 2 Manufacturing overhead applied from Fabrication to Job Bravo 2 Total departmental manufacturing overhead applied to Job Bravo
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started