Estimated Overhead cost is 80,000, estimated factor cost is 20,000 so POHR is? Q4 0 none of them Estimated Overhead cost is 80,000, estimated factor
Estimated Overhead cost is 80,000, estimated factor cost is 20,000 so POHR is? 4 O none of them 0.25 O 80,000