Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

EX 12-6 Calculate lead time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through

EX 12-6 Calculate lead time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 30 parts. A part requires 5 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 5 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 4 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. (Round percentages to one decimal place.)

image text in transcribed

Traditional Philosophy Lean Manufacturing Philosophy Value-Added Time / Total Time = Value-Added Ratio Traditional Philosophy Lean Manufacturing Philosophy Value-Added Time / Total Time = Value-Added Ratio

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Investment Grade Energy Audit Making Smart Energy Choices

Authors: Shirley J. Hansen, James W. Brown

1st Edition

0824709284, 978-0824709280

More Books

Students also viewed these Accounting questions