Example (Unit Load Size): Three machines ( A,B and C) are needed to process a unit of a product. The product must be processed by
Example (Unit Load Size): Three machines ( A,B and C) are needed to process a unit of a product. The product must be processed by machine A before going to machine B and machine C. There are two machine A's and two machine C's in the process. The figure below shows the sequence. Assume Unit Load Size: 2, 5 and 10. What is the total processing time and total cost of each size