Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Exercise 08-22 Overhead controllable and volume variances; overhead variance report LO P4 Blaze Corp. applies overhead on the basis of direct labor hours. For the
Exercise 08-22 Overhead controllable and volume variances; overhead variance report LO P4 Blaze Corp. applies overhead on the basis of direct labor hours. For the month of March, the company planned production of 10,000 units (80% of its production capacity of 12,500 units) and prepared the following budget. Operating Levels 80% 10,000 20,000 Overhead Budget Production in units Standard direct labor hours Budgeted overhead Variable overhead costs Indirect materials Indirect labor Power Maintenance Total variable costs . Fixed overhead costs Rent of factory building Depreciation Machinery Taxes and insurance Supervisory salaries Total fixed costs Total overhead costs $18, 200 14,000 4,000 1,800 38,000 12,000 20,000 2,800 13,200 48,000 $86,000 During March, the company operated at 90% capacity (11,250 units), and it incurred the following actual overhead costs. Overhead costs (actual) Indirect materials Indirect labor Power Maintenance Rent of factory building $18,200 14,000 4,500 2,750 12,000 During March, the company operated at 90% capacity (11,250 units), and it incurred the following actual overhead costs. Overhead costs (actual) Indirect materials Indirect labor Power Maintenance Rent of factory building DepreciationMachinery Taxes and insurance Supervisory salaries Total actual overhead costs $18,200 14,000 4,500 2,750 12,000 18,500 3,500 14,200 $87,650 1. Compute the overhead controllable variance. 2. Compute the overhead volume variance. 3. Prepare an overhead variance report at the actual activity level of 9,000 units. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Compute the overhead controllable variance. Classify as favorable or unfavorable. (Indicate the effect of each v selecting for favorable, unfavorable, and no variance. Do not round intermediate calculations.) Controllable Variance Total actual overhead Flexible budget overhead Total Overhead controllable variance Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Compute the overhead volume variance. Classify as favorable or unfavorable. (Indicate the effect of each selecting for favorable, unfavorable, and no variance. Do not round intermediate calculations.) Volume Variance Volume variance te ellect or each variance uy selecuny Tor Tavuravie, unravurable, anu no variance. Do not rouniu interneurale calculations.) BLAZE CORP Overhead Variance Report For Month Ended March 31 Expected production volume Production level achieved Volume variance Controllable Variance Flexible Budget Actual Results Variances Fav. / Unfav. Variable overhead costs: Fixed overhead costs: Total overhead costs
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started