Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line.

image text in transcribed
image text in transcribed
image text in transcribed
Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Rounded Edge Squared Edge Total Direct materials Direct labor Overhead (300% of direct labor cost Total cost Quantity produced Average cost per ft. (rounded) s 9,700 6,100 18,300 $34,100 $21, 600 11,900 35, 700 $69,200 31,300 18,000 54,000 $103,300 10,600 ft. 14,200 ft. $ 3.22 4.87 Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $54,000 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information. Overhead Cost Category (Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Total overhead Cost s 2,160 28,840 23,000 54,000 She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.) Overhead Cost Category (Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Driver Rounded Edge Squared Edge Total Direct labor cost () Machine hours $6,100 $11,900 $18,000 200 hours 32 times 700 hours 93 times 900 hours 125 times Setups (number) Required: 1. Assign these three overhead cost pools to each of the two products using ABC. Activity Overhead Cost Activity Drivers Activity Rate Supervision 2,160 18,000 Direct labor cost 12.001 % l of direct labor cost Depreciation of machinery28,840900 Machin Assembly line preparation Per machine hour Setups Per setup Activity driverOverhead assigned Rounded edge Activity rate incurred Supervision Depreciation of machinery Assembly line preparation Per machine hour Per setup Activity driverO Squared edge Activity rate Overhead assigned incurred Components 12.001% lo Supervision Depreciation of machinery Per machine hour Per setup Determine average cost per foot for each of the two products using ABC. Rounded edge Squared edge

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Cost Accounting A Managerial Emphasis

Authors: Charles T. Horngren, George Foster, Srikant M. Datar, Madhav T. Rajan, Chris M. Ittner

13th Edition

0131355589, 978-0131355583

More Books

Students also viewed these Accounting questions

Question

What aspects would it be impossible to capture?

Answered: 1 week ago

Question

Enhance your words with effective presentation aids

Answered: 1 week ago