Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded period, the company reports the following data. ge and

image text in transcribed
image text in transcribed
Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded period, the company reports the following data. ge and squared edge, on the same production line. For the current Direct materials Direct labor Overhead (3008 of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,400 6,200 18,600 $34,200 10,500 ft. $ 3.26 Squared Edge Total $21,600 $ 31,000 11,900 18,100 35,700 54,300 $69,200 $103,400 14,100 ft. $ 4.91 Glassworks's controller wishes to apply activity based costing (ABC) to allocate the $54,300 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information Overhead Cost Category (Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Total overhead Cost $ 2,172 29,000 23,128 $54,300 She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.) Usage age Overhead Cost Category (Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Driver Direct labor cost (5) Machine hours Setups (number) Rounded Edge $6,200 400 hours 31 times Squared Edge $11,900 600 hours 95 times Total $18,100 1,000 hours 126 times 318,106 houten Activity Rate Required: 1. Assign these three overhead cost pools to each of the two products using ABC. Activity Overhead Cost Activity Drivers Supervision Direct labor cost Depreciation of machinery Machine hours Assembly line preparation Setups Activity rate Activity driver incurred Overhead assigned Rounded edge Supervision Depreciation of machinery Assembly line preparation Squared edge Activity rate Activity driver Overhead assigned incurred Overhead assigned Supervision Depreciation of machinery Assembly line preparation 2. Determine average cost per foot for each of the two products using ABC Rounded edge Squared edge

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Process Auditing And Techniques Guide

Authors: J.P. Russell

2nd Edition

087389782X, 978-0873897822

More Books

Students also viewed these Accounting questions