Exeter Mines produces iron ore at four different mines; however, the ores extracted at each mine are different in their iron content. Mine 1
Exeter Mines produces iron ore at four different mines; however, the ores extracted at each mine are different in their iron content. Mine 1 produces magnetite ore, which has a 70% iron content; mine 2 produces limonite ore, which has a 60% iron content; mine 3 produces pyrite ore, which has a 50% iron content; and mine 4 produces taconite ore, which has only a 30% iron content. Exeter has three customers that produce steel-Armco, Best, and Corcom. Armco needs 400 tons of pure (100%) iron, Best requires 250 tons of pure iron, and Corcom requires 290 tons. It costs $37 to extract and process 1 ton of magnetite ore at mine 1, $46 to produce 1 ton of limonite ore at mine 2, $50 per ton of pyrite ore at mine 3, and $42 per ton of taconite ore at mine 4. Exeter can extract 350 tons of ore at mine 1; 530 tons at mine 2; 610 tons at mine 3; and 490 tons at mine 4. The company wants to know how much ore to produce at each mine in order to minimize cost and meet its customers' demand for pure (100%) iron. Formulate a linear programming model for this problem. Solve the linear programming model for computer. a. Do any of the mines have slack capacity? If yes, which one(s)? b. If Exeter Mines could increase production capacity at any one of its mines, which should it be? Why? c. If Exeter decided to increase capacity at the mine identified in (b), how much could it increase capacity before the optimal solution point (i.e., the optimal set of variables) would change? Exeter Mines by using the d. If Exeter determined that it could increase production capacity at mine 1 from 350 tons to 500 tons, at an increase in production costs to $43 per ton, should it do so?
Step by Step Solution
★★★★★
3.30 Rating (153 Votes )
There are 3 Steps involved in it
Step: 1
The linear programming model for this problem is as follows Minimize cost 37x1 46x2 50x3 42x4 Subjec...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started