F16 A B D G 1 3 K M 25 ABC, Inc., Isa manufacturer of that anticipates nationwide demand for the next year to be in Market M1, M2, M3, and MA as gven in the table below. Managers at ABC are designing the manufacturing network and have selected four potential sites-S1, S2, S3, and S4. Plants could have a capacity of either 200,000 or 300,000 units. The annual fixed costs at the four locations are shown in the table below, along with the cost of producing and shipping one product to each of the four markets. Where should ASC build its 1 factories and how large should they be? 2 3 S1 S2 S3 S4 Ragam 4 Fleed Costa 5 2005 000.000 5.000,000 5,000,000 6.000.000 6 300K 3,000.000 1.000.000 0.000.000 NO.000 7 Variable Coute 8 M1 200 2010 250 310 110.000 9 M2 230 220 240 2006 200.000 10 M3 250 230 215 275 130.000 11 M4 XO 200 270 200 100.000 12 13 14 15 16 17 18 19 20 21 22 23 24 + - - - - F16 A B D G 1 3 K M 25 ABC, Inc., Isa manufacturer of that anticipates nationwide demand for the next year to be in Market M1, M2, M3, and MA as gven in the table below. Managers at ABC are designing the manufacturing network and have selected four potential sites-S1, S2, S3, and S4. Plants could have a capacity of either 200,000 or 300,000 units. The annual fixed costs at the four locations are shown in the table below, along with the cost of producing and shipping one product to each of the four markets. Where should ASC build its 1 factories and how large should they be? 2 3 S1 S2 S3 S4 Ragam 4 Fleed Costa 5 2005 000.000 5.000,000 5,000,000 6.000.000 6 300K 3,000.000 1.000.000 0.000.000 NO.000 7 Variable Coute 8 M1 200 2010 250 310 110.000 9 M2 230 220 240 2006 200.000 10 M3 250 230 215 275 130.000 11 M4 XO 200 270 200 100.000 12 13 14 15 16 17 18 19 20 21 22 23 24 +