FACT SCENARIO E (Questions 19-22): Geddy Construction (GC) has a written contract with Owner, an Oklahoma municipality, to build a sewer treatment plant with three

FACT SCENARIO E (Questions 19-22):

Geddy Construction (GC) has a written contract with Owner, an Oklahoma municipality, to build a sewer treatment plant with three lagoons. The prime contract is governed by the 2017 Edition of AIA Document A201. Owner hired YYZ Design (YYZ) to prepare the plans and specifications. YYZ, in turn, hired an independent lab to perform a comprehensive soils test. Based on the results of the soils test, the plans and specifications prepared by YYZ called for the installation of bentonite-treated clay liners in the three lagoons. The specified mix ratio was 3%. Significant leaks appeared shortly after the lagoons were constructed and filled with water. The project was shut down for 3 months while the source of the leaks and a possible solution were investigated. GC, Owner, and YYZ subsequently determine that the specified bentonite mix ratio of 3% was inadequate to properly seal the floor of the lagoons. At the Owner's request, GC prepares a cost estimate to rework the clay liners with additional bentonite. After receiving GC's cost estimate, the Owner and YYZ decide that GC should have recognized the error in the specifications and reported the problem before the clay liners were first installed. The Owner and YYZ issue a change directive requiring GC to proceed with the remedial work at GC's own expense. In total, the project takes 6 months longer than expected and GC spends $150,000 on the lagoon repairs. YYZ is also the designated Initial Decision Maker (IDM).

Assume that GC submits a claim to YYZ for an increase in the contract price and/or contract time. If GC is dissatisfied with YYZ's decision, what must it and how long does it have to do it?

Group of answer choices

Demand mediation within 30 days.

File a lien within 120 days from the date if its final invoice.

File suit within 5 years after sending a pre-lien notice.

Demand arbitration within 4 months of the date of last performance.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Contemporary Family Law

Authors: Douglas Abrams, Naomi Cahn, Catherine Ross, Linda McClain

5th Edition

1640205918, 978-1640205918

More Books

Students also viewed these Law questions

Question

Would you be willing to work with them?

Answered: 1 week ago

Question

2. Ask questions, listen rather than attempt to persuade.

Answered: 1 week ago