Factory Overhead Cost Variances The following data relate to factory overhead cost for the production of 10,000 computers: Actual: Variable factory overhead $262,000 Fixed factory

Factory Overhead Cost Variances

The following data relate to factory overhead cost for the production of 10,000 computers:

Actual: Variable factory overhead $262,000
Fixed factory overhead 90,000
Standard: 14,000 hrs. at $25 350,000

If productive capacity of 100% was 15,000 hours and the total factory overhead cost budgeted at the level of 14,000 standard hours was $356,000, determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. The fixed factory overhead rate was $6.00 per hour. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started