Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Figure 2 : Final Network Design with Router providing connection to four Subnets Your task in this Assignment I ) Use IP subnet 1 5
Figure : Final Network Design with Router providing connection to four Subnets
Your task in this Assignment
I Use IP subnet for the entire HighTech Organization
II Decide on the subnet number based on the diagram and also decide on the Subnet Mask
III Assign IP Address and Subnet Mask to EACH Port of the router based on which subnet they belong to Make sure the ports are ON
IV Assign IP Addresses, Subnet Mask, and Default Gateway IP Address for EACH computer, server, and tablet
Note: See Special Instructions in the next pages to Configure the Router in Figure II above Midterm Exam
Special Instructions to Configure the Router PTROUTER
I This Network Configuration requires careful consideration of Router Selection. You are to Select PTRouter. Do NOT select any other Router as the Physical View will be different and will not match the following Figure.
II Ignore Router Number: Routerthis number is automatically assigned by CPT
III To Select PTRouter, you will first need to select Router ICON and then from the RightPanel list of Router Symbols you select PTRouter which should be next to Router Numbered
IV Drag and Drop PTRouter on the CPT Main Window.
V Then Click on the PT Router and Choose Physical Tab next to Config. You should see a Figure similar to the following Figure Exactly
Note: If the following figure does NOT match yours, then you have chosen a different Router. Try again.
Normal
No Spacing
Heading
kouter
Paragraph
Styles
Physical Config CU Attributes
Top
Next, you will need to do some Hardware Configuration of the PTRouter.
I PTRouter ONLY has TWO Copper Cable Ports. You will need to ADD TWO MORE Copper Cable Ports NICs to the Router. You go to Physical View and Turn OFF the Router see ONOFF Button pointed in the Figure above
a There is a Switch ONOFF on Physical View Scroll to the Right and you will see Click on the Switch and it will turn off the Router.
II On the left Panel Physical View you will see several Network Interface Card Modules. Choose the ONE that says Copper Media or Copper or Fiber Media CFE Read the description to make sure it is Ethernet and
States LPublic
Text Predictions: On
if Accessibility: Investigate
Search
notTan
IV Now TURN ON your Router. DO NOT FORGET THIS STEP YOU SHOULD SEE SAMLL GREEN LIGHT ON THE SWITCH
V After Step IV above you should have FOUR Ports that support Copper Cables on your Router.
VI NOW connect each Router Port to Layer Switch as required in your Assignment. Choose Auto Connect FOR CABLES
NOW YOU ARE READY TO USE THIS PHYSICALLY CONFIGURED ROUTER TO COMPLETE YOUR NETWORK DESIGN AS PER FIGURE II ON PAGE Midterm Exam Network Diagram
REQUIREMENTS AND DELIVERABLES FOR MIDTERM EXAM PART II USING CPT NONNEGOTIABLE:
a Ping Server from
b Ping Server from PC
c Ping Server from Tablet
d Ping Server from Tablet
Figure l: Original Network Diagram from Assignment I
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started