find: the AOA network ( draw ) and the path with the longest expected duration. B ) all event slacks. C 0 critical path to

find: the AOA network (draw) and the path with the longest expected duration. B) all event slacks. C0 critical path to event D

Step by Step Solution

There are 3 Steps involved in it