Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Fisher Fixtures manufactures three types of lighting fixtures, with model names of Silver, Gold, and Platinum. It applies all indirect costs according to an annual

Fisher Fixtures manufactures three types of lighting fixtures, with model names of Silver, Gold, and Platinum. It applies all indirect costs according to an annual predetermined rate based on direct labor-hours. The plant controller has recommended that the company switch to an activity-based costing system. The controller's staff prepared the following cost estimates for next year (year 2) for the recommended cost drivers.
Activity Recommended Cost Driver Estimated Cost Estimated Cost Driver Activity
Purchasing material Number of purchase orders $ 122,400240 purchase orders
Receiving material Direct materials cost 227,200 $ 2,840,000
Setting up equipment Number of production runs 220,920120 runs
Machine depreciation and maintenance Machine-hours 76,13015,226 hours
Ensuring regulatory compliance Number of inspections 440,10054 inspections
Shipping Number of units shipped 1,062,000590,000 units
Total estimated cost $ 2,148,750
In addition, management estimated 45,000 direct labor-hours for year 2.
Assume that the following cost-driver volumes occurred in January, year 2:
Silver Gold Platinum
Number of units produced 32,00010,0003,000
Direct labor-hours 2,0001,200400
Number of purchase orders 763
Direct materials costs $ 97,500 $ 60,000 $ 37,500
Number of production runs 235
Machine-hours 700175100
Number of inspections 023
Units shipped 32,00010,0003,000
Labor costs are based on the contractual rate of $25 per hour.
Required:
Compute the predetermined rate for year 2 for use in the current product-costing system using direct labor-hours as the allocation base.
Compute the per-unit production costs for each model for January using direct labor-hours as the allocation base and the predetermined rate computed in requirement (a).
Compute the predetermined overhead rate for year 2 for each cost driver using the estimated costs and estimated cost driver units prepared by the controller's staff to be used in an ABC system.
Compute the per unit production costs for each product for January using the cost drivers recommended by the consultant and the predetermined rates computed in requirement (c).(Note: Do not assume that total overhead applied to products in January will be the same for activity-based costing as it was for the labor-hour-based allocation.)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

ACCA Approved Study Text P7 Advanced Audit And Assurance

Authors: BPP

1st Edition

1472744349, 978-1472744340

More Books

Students also viewed these Accounting questions

Question

=+ (b) Shows that Q agrees with P on Fo.

Answered: 1 week ago